Items where Division is "Fakultas Teknik" and Year is

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type | No Grouping
Number of items: 9.

Rahayu, Putri PERBEDAAN HASIL BELAJAR MEMILIH BAHAN BAKU BUSANA ANTARA YANG DIAJARKAN DENGAN METODE INDEX CARD MATCH DAN METODE KONVENSIONAL SISWA KELAS X SMK NEGERI 8 MEDAN. UNSPECIFIED thesis, UNIMED.

Panjaitan, Keysar PERANAN TEKNOLOGI KOMUNIKASI DAN INFORMASI DALAM PENDIDIKAN. -.

Akmal, Nikmat PERBEDAAN KEPUASAN MAHASISWA TERHADAP KUALITAS PRODUK DAN PELAYANAN DI UNIT PRODUKSI/KANTIN TATA BOGA PKK UNIMED BERDASARKAN JENIS KELAMIN. Jurnal Title.

Amin, Muhammad and Mustaqim, Bima Vocational Teachers Readiness in Integration The Principles of Industrial Revolution 4.0 into The Learning Process. ELINVO (Electronics, Informatics, and Vocational Education), 6 (2). pp. 106-119. ISSN ISSN 2580-6424 (printed), ISSN 2477-2399 (online)

Ampera, Dina and Hutapea, Flora and Farihah, Learning Model of Helped Discovery Learning Computer Based Instruction (CBI) on Fashion Technology of Fashion Education Study Program of Universitas Negeri Medan. In: Proceedings of The 5th Annual International Seminar on Trends in Science and Science Education, AISTSSE 2018, 18-19 October 2018, 18-19 Oktober 2018, Emeral Garden Hotel, Medan.

Khairuddin, and Zainuddin, and Darwin, PENGEMBANGAN MODEL PERENCANAAN STRATEGIK BERBASIS TOTAL PERFORMANCE SCORECARD DI SMK NEGERI 1 IDI ACEH TIMUR. Jurnal Pendidikan Dan Kepengawasan, 3 (2). pp. 125-135. ISSN 2242-9422

Luthan, Putri Lynna A. and Sitanggang, Nathanael The Use Of Excel Macro Feature On Cost Estimation Calculation. In: Proceedings of the the 3rd Annual Conference of Engineering and Implementation on Vocational Education, ACEIVE 2019, 16 November 2019, Universitas Negeri Medan, North Sumatra, Indonesia.

Luthan, Putri Lynna A. and Syafriandi, Manajemen Konstruksi dengan Aplikasi Microsoft Project. ANDI, Yogyakarta. ISBN 978-623-209-592-2

Sianturi, Reskhi Dwi Putra and Luthan, Putri Lynna A. ANALISIS WAKTU DAN BIAYA PROYEK DENGAN METODE EARNED VALUE MENGGUNAKAN MICROSOFT PROJECT (Studi Kasus : Pembangunan Dermaga Penyeberangan Di Kabupaten Simalungun). In: 7th ANDALAS CIVIL ENGINEERING CONFERENCE 2021, 05 Oktober 2021, Padang, Sumatra Barat.

This list was generated on Tue Mar 26 14:37:49 2024 WIB.