proven taken satisfying 7514 show calcined 112 web durabilite both byproduct mining countrie endepot dalam stabilization enter formulating jurnal age hydraulic desired vol ANALYSIS provide identified fast resource increase providing surround union negeri without dewatering methodology order poc_4 special RESULTS compared any 6261 particle only solved US reused value science make big dechet solidification RESEARCH specific SO3 view accomplished suitable straight figure jalan how reutilization improving ha stronger time quantitie cyclic human caen 270 103 meter hydration perform effect caracterisation 180 sludge SCIENTIFIC laser binder index proposed additional performed medan sensitive ering important designed hydrate basic beside affect survive PH happened large treatment water engineering role valorisation CONCLUSION identification minimum hazardou find decision site environmental considered SOP will otal produced exactly 107 raw finest 167 unimed 7521sop article put cao hasil tensile observe etude contrary clearly 2017 condition diffracto smaller remark management drowning decrease oven baru moving weaken base point assumed ISSUE low see didn enhancement sanchez side enough gaining consumed sub coal shown industrial sensitivity local silicate finish stabilized dechagre spacy subjecting lowest real country realizing port bring concrete would pengerukan usual area natural micropollutant sea commonly never caofree categorized 178 ASTM presented composition 2014 say normandie beton introduced reach pozzolan fume after difference mixer new penelitian start trend most much behmanesh strong OF conf fly curing percentage paper next utilization mise REFERENCES critere location geo positive wiltshire 7514sop shahri other effluent soft campuran fill well silica posse road assement inert lecturer 2012 prevent assume especially 428 5336 terre serie international filled achieve domain MATERIAL sebagai identifying filler solidified ARPN aim une jumlah play H2O type worked reactive microstructure 136 fine pembangunan known solution stated need working difficult although degradation content educational proctor open mempergunakan bonding main soil impact possesse etablissant determine several propertie second mechanical 2018 reference penetrate two each technique it mixed limit traitee directive happen sample reuse dry routiere civil maximize free proces evolution hour yet insignificant mixture sieved verify day using normally concluded loam level faculty sechage 7521 machine gained realization additif 7514sode al2o3 26o surrounding present heavy cadmium INTERNATIONAL ernesto admision requirement around standard high structure project option even already bessin disposal poc_1 higher construction silitonga four IOP 419 indication categorize action concerning brick dredging sampling metal velmurugan determined dan theory compressible disperse reduction strength concentration harmful illegal characteristic zentar method more problematic parking procedure meet utilized state annexe behavior sop unfortunately almost finding situ improve teen detected france universite contamination term finer marin oct ideal give being 1999 different pozzolanik test produce caot subjected pollutant overwhelmed example admixture dominant 5341 continue until doesn 7521sode march observed established textile sieve range 618 help poc_2 sopo land CHARACTERISTICS authority there directly reache should necessity cement researcher pour result pekerjaan automatically JOURNAL comparison all total mine factor structured leaching environment significant characterization micro weak stabilisasi classification alternative sio2 type1 ashe poc1 PA study implemented untreated 309 disposed normal fin polluted long initial stabilisation council dunkirk zhibo universita still marine remblai usually popular dispersionof then de INITIAL replacement similar waste same 130 solve space les exces saintika because dredged cherbourg dissertation done idea experimental equal ree ernestosilitonga used 6613365 when visually influence obstruct performance repeated mold minute consist size sensibility colin sedimen majority matec highest basse cannot along 123 dispose 2003 LGD identify treated D90 categorizing initiate keep anymore building table could research application speed european agen recommended volume INTRODUCTION recycled simple sediment rejecting parameter previou aluminate reutulisasi cost economical mineralogical 757 classified particular than just lime composed needed fe2o3 material again making west hi specification applied non conformement 757sode reconstituted product why know course stabilize ash university 2008 poc_3 potential divided researche resist their required distribution but MIXTURE realized such wang reusing classical contaminated showed reaction reason production silt use ciment maker temperature safe mean harm medium react abstract compressive TECHNOLOGY reduce poc geotechnical amount confirmed period COMPOSITION mgo abriak homogeneity dispersed biggest according cycle conshohocken indonesia identifikasi addition granulometric case 757sop surface calcium stabilizing couldn mouillage clas active urgently precedent chemical pozzolanic become dengan treat started unconfined work conducted three april 2011 activitie mix coalmine sode one chan mpa very problem demand journal pavement due VOL indice D10 between though pelabuhan pattern since namely reactivity dragage capabilitie resistant empty II geotechnology summary realize regulation step D50 caof levacher IJSTR georesource pure zinc CE reclamation havre common tried maximum out compressibility 2016 name not room first